17:53 08 Jan 25
Project:
4479 Wastewater Treatment with Biogas System in Palm Oil Mill at Kanjanadij, Surat Thani, Thailand
- Request for post-registration changes
Project | 4479 Wastewater Treatment with Biogas System in Palm Oil Mill at Kanjanadij, Surat Thani, Thailand |
---|---|
PRC ref | PRC-4479-001 |
Process track | Prior approval |
DOE | SIRIM |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 10 Feb 11 - 09 Feb 21 |
Assessment opinion | Assessment opinion (249 KB) |
Revised PDD | Revised PDD (503 KB) Revised PDD - track changes (558 KB) |
Supplementary documents | |
Signed form | Signed form (579 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 15 Mar 13 -
Approved
Effective approval date: 07 Mar 13
|
Historic statuses |
29 Jan 13 -
Published 29 Jan 13 - Summary note being prepared 14 Feb 13 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: