16:51 29 Oct 25
Project:
4479 Wastewater Treatment with Biogas System in Palm Oil Mill at Kanjanadij, Surat Thani, Thailand
- Request for post-registration changes
| Project | 4479 Wastewater Treatment with Biogas System in Palm Oil Mill at Kanjanadij, Surat Thani, Thailand |
|---|---|
| PRC ref | PRC-4479-001 |
| Process track | Prior approval |
| DOE | SIRIM |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 10 Feb 11 - 09 Feb 21 |
| Assessment opinion |
Assessment opinion (249 KB)
|
| Revised PDD |
Revised PDD (503 KB)
Revised PDD - track changes (558 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (579 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 15 Mar 13 -
Approved
Effective approval date: 07 Mar 13
|
| Historic statuses |
29 Jan 13 -
Published 29 Jan 13 - Summary note being prepared 14 Feb 13 - Awaiting EB decision |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: