Project: 4479 Wastewater Treatment with Biogas System in Palm Oil Mill at Kanjanadij, Surat Thani, Thailand - Request for post-registration changes
Project 4479 Wastewater Treatment with Biogas System in Palm Oil Mill at Kanjanadij, Surat Thani, Thailand
PRC ref PRC-4479-001
Process track Prior approval
DOE SIRIM
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 10 Feb 2011 - 15 Dec 2012

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 10 Feb 11 - 09 Feb 21
Assessment opinion Assessment opinion (249 KB)
Revised PDD Revised PDD (503 KB)   Revised PDD - track changes (558 KB)
Supplementary documents
Signed form Signed form (579 KB)
DOE clarification
VVS version VVS 2.0
Current status 15 Mar 13 - Approved
Effective approval date: 07 Mar 13
Historic statuses 29 Jan 13 - Published
29 Jan 13 - Summary note being prepared
14 Feb 13 - Awaiting EB decision