Project: 7289 Jiangxi Xiajiang Hydropower Project - Request for post-registration changes
Project 7289 Jiangxi Xiajiang Hydropower Project
PRC ref PRC-7289-001
Process track Issuance
DOE LGAI Tech. Center S.A
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Aug 13 - 31 Jul 20
Assessment opinion Assessment opinion (139 KB)
Revised PDD Revised PDD (1439 KB)   Revised PDD - track changes (1441 KB)
Supplementary documents
Signed form Signed form (77 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 09 Dec 21 - Approved
Effective approval date: 09 Dec 21
Historic statuses 10 Nov 21 - Request published