18:16 28 Mar 24
Project:
0085 Hapugastenne and Hulu Ganga Small Hydropower Projects.
- Request for post-registration changes
Project | 0085 Hapugastenne and Hulu Ganga Small Hydropower Projects. |
---|---|
PRC ref | PRC-0085-002 |
Process track | Prior approval |
DOE | DNV |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 01 Jan 03 - 31 Dec 12 |
Assessment opinion | Assessment opinion (142 KB) |
Revised PDD | Revised PDD (276 KB) Revised PDD - track changes (277 KB) |
Supplementary documents |
Appendix 1 - Hapugastenne and Hulu Ganga ER calculation sheet.xlsx (12 KB)
|
Signed form | Signed form (103 KB) |
DOE clarification |
DOE clarification 1 - 0085_PRC_Clarifications_2014-02-10.pdf (214 KB)
DOE clarification 2 - table 1 monthly elec import.xls (30 KB) |
VVS version | VVS 2.0 |
Current status | 26 Mar 14 -
Approved
Effective approval date: 18 Mar 14
|
Historic statuses |
15 Jan 14 -
Published 29 Jan 14 - Awaiting DOE clarifications 10 Feb 14 - DOE clarifications received 10 Feb 14 - Summary note being prepared 25 Feb 14 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: