Project: 1338 Lufeng Jiadong First Phase Wind Farm Project - Request for post-registration changes
Project 1338 Lufeng Jiadong First Phase Wind Farm Project
PRC ref PRC-1338-001
Process track Issuance
DOE TÜV SÜD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 15 Feb 08 - 14 Feb 15
Assessment opinion Assessment opinion (1282 KB)
Revised PDD Revised PDD (438 KB)   Revised PDD - track changes (536 KB)
Supplementary documents Appendix 1 - ref.1338 IRR calculations post- change version .xls (88 KB)
Signed form Signed form (525 KB)
DOE clarification
VVS version VVS 2.0
Current status 27 Mar 14 - Approved
Effective approval date: 27 Mar 14
Historic statuses 26 Feb 14 - Request published