06:29 27 May 26
Project:
1338 Lufeng Jiadong First Phase Wind Farm Project
- Request for post-registration changes
| Project | 1338 Lufeng Jiadong First Phase Wind Farm Project |
|---|---|
| PRC ref | PRC-1338-001 |
| Process track | Issuance |
| DOE | TÜV SÜD |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 15 Feb 08 - 14 Feb 15 |
| Assessment opinion | Assessment opinion (1282 KB) |
| Revised PDD |
Revised PDD (438 KB)
Revised PDD - track changes (536 KB)
|
| Supplementary documents |
Appendix 1 - ref.1338 IRR calculations post- change version .xls (88 KB)
|
| Signed form | Signed form (525 KB) |
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 27 Mar 14 -
Approved
Effective approval date: 27 Mar 14
|
| Historic statuses |
26 Feb 14 -
Request published |

Revised PDD - track changes
Appendix 1 - ref.1338 IRR calculations post- change version .xls
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: