06:49 04 Nov 25
			
			
      Project:
      4930 Vaayu India Wind Power Project in Tamilnadu
      - Request for post-registration changes
    
					| Project | 4930 Vaayu India Wind Power Project in Tamilnadu | 
|---|---|
| PRC ref | PRC-4930-002 | 
| Process track | Prior approval | 
| DOE | LGAI Tech. Center S.A | 
| 
          Methodology(ies) and/or Standardized Baseline(s) 
           applied at the post-registration changes  | 
        No changes | 
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) | 
| Type of submission | 
          
            Corrections that do not affect project design
            
 Permanent changes from the monitoring plan or the monitoring methodology 
 Changes to the project or programme design 
  | 
      
| Applicable crediting period | 19 Jul 11 - 18 Jul 21 | 
| Assessment opinion | 
           Assessment opinion (222 KB)
         | 
      
| Revised PDD | 
           Revised PDD (3754 KB)
           
           Revised PDD - track changes (5313 KB)
         | 
      
| Supplementary documents | 
          
            
              
               Appendix 1 - 4930-Investment analysis_VIPCPL(PRC)-1.xlsx (66 KB)
              
              
            
             Appendix 2 - 4930-Investment analysis_VIPCPL(PRC)-2_ver02_7Jul2018.xlsx (69 KB)
              
              
            
             |  
      
| Signed form | 
           Signed form (32 KB)
         | 
      
| DOE clarification | 
          
            
              
              
              
              
            
             | 
      
| VVS version | VVS-PA 1.0 | 
| Current status | 17 Jan 19 -
                      Approved
             
              Effective approval date: 16 Jan 19
             
            
           | 
        
| Historic statuses | 
            
              
                
                03 Sep 18 -
                Published 17 Sep 18 - Awaiting DOE clarifications 10 Dec 18 - DOE clarifications received 10 Dec 18 - Summary note being prepared 27 Dec 18 - Awaiting EB decision  | 
        

Assessment opinion
Appendix 1 - 4930-Investment analysis_VIPCPL(PRC)-1.xlsx
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: