Project: 4930 Vaayu India Wind Power Project in Tamilnadu - Request for post-registration changes
Project 4930 Vaayu India Wind Power Project in Tamilnadu
PRC ref PRC-4930-002
Process track Prior approval
DOE LGAI Tech. Center S.A
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: Actual operational parameters differ from the expected parameters, None of the above
Applicable crediting period 19 Jul 11 - 18 Jul 21
Assessment opinion Assessment opinion (222 KB)
Revised PDD Revised PDD (3754 KB)   Revised PDD - track changes (5313 KB)
Supplementary documents Appendix 1 - 4930-Investment analysis_VIPCPL(PRC)-1.xlsx (66 KB)
Appendix 2 - 4930-Investment analysis_VIPCPL(PRC)-2_ver02_7Jul2018.xlsx (69 KB)
Signed form Signed form (32 KB)
DOE clarification
VVS version VVS-PA 1.0
Current status 17 Jan 19 - Approved
Effective approval date: 16 Jan 19
Historic statuses 03 Sep 18 - Published
17 Sep 18 - Awaiting DOE clarifications
10 Dec 18 - DOE clarifications received
10 Dec 18 - Summary note being prepared
27 Dec 18 - Awaiting EB decision