03:17 24 Nov 24
Project:
4930 Vaayu India Wind Power Project in Tamilnadu
- Request for post-registration changes
Project | 4930 Vaayu India Wind Power Project in Tamilnadu |
---|---|
PRC ref | PRC-4930-002 |
Process track | Prior approval |
DOE | LGAI Tech. Center S.A |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 19 Jul 11 - 18 Jul 21 |
Assessment opinion | Assessment opinion (222 KB) |
Revised PDD | Revised PDD (3754 KB) Revised PDD - track changes (5313 KB) |
Supplementary documents |
Appendix 1 - 4930-Investment analysis_VIPCPL(PRC)-1.xlsx (66 KB)
Appendix 2 - 4930-Investment analysis_VIPCPL(PRC)-2_ver02_7Jul2018.xlsx (69 KB) |
Signed form | Signed form (32 KB) |
DOE clarification |
|
VVS version | VVS-PA 1.0 |
Current status | 17 Jan 19 -
Approved
Effective approval date: 16 Jan 19
|
Historic statuses |
03 Sep 18 -
Published 17 Sep 18 - Awaiting DOE clarifications 10 Dec 18 - DOE clarifications received 10 Dec 18 - Summary note being prepared 27 Dec 18 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: