Project: 3055 Jingshan Kaidi Biomass Power Project - Request for post-registration changes
Project 3055 Jingshan Kaidi Biomass Power Project
PRC ref PRC-3055-001
Process track Issuance
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Jan 11 - 31 Dec 17
Assessment opinion Assessment opinion (255 KB)
Revised PDD Revised PDD (7895 KB)   Revised PDD - track changes (6531 KB)
Supplementary documents Appendix 1 - 5_Jingshan 1st_ER calculation for PRC (part of PRC).xls (49 KB)
Appendix 2 - 5_Jingshan 1st_Project IRR and NPV for PRC with former biomass price (part of PRC).xls (133 KB)
Appendix 3 - 5_Jingshan 1st_Project IRR and NPV for PRC with present biomass price (part of PRC).xls (128 KB)
Signed form Signed form (178 KB)
DOE clarification
VVS version VVS 2.0
Current status 15 Apr 13 - Approved
Effective approval date: 15 Apr 13
Historic statuses 15 Mar 13 - Request published