Project: 0340 Reduction in steam consumption in stripper reboilers through process modifications - Request for post-registration changes
Project 0340 Reduction in steam consumption in stripper reboilers through process modifications
PRC ref PRC-0340-001
Process track Prior approval
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 17 Feb 04 - 16 Feb 14
Assessment opinion Assessment opinion (371 KB)
Revised PDD Revised PDD (537 KB)   Revised PDD - track changes (575 KB)
Supplementary documents Appendix 1 - Ex-Ante CER calculations revised.zip (12 KB)
Signed form Signed form (55 KB)
DOE clarification
VVS version VVS 2.0
Current status 09 Sep 13 - Approved
Effective approval date: 04 Sep 13
Historic statuses 30 Jul 13 - Published
30 Jul 13 - Summary note being prepared
14 Aug 13 - Awaiting EB decision