Project: 4502 Qinyu small Hydropower Project in Gansu Province - Request for post-registration changes
Project 4502 Qinyu small Hydropower Project in Gansu Province
PRC ref PRC-4502-001
Process track Prior approval
DOE CEPREI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 11 Jun 2011 - 08 Jun 2012

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 18 Feb 11 - 17 Feb 18
Assessment opinion Assessment opinion (650 KB)
Revised PDD Revised PDD (1522 KB)   Revised PDD - track changes (879 KB)
Supplementary documents Appendix 1 - ER spreadsheet_MP1_RN4502_v02.xls (60 KB)
Appendix 2 - MR_Qinyu_RN4502_v2.pdf (207 KB)
Signed form Signed form (52 KB)
DOE clarification
VVS version VVS 2.0
Current status 09 Sep 13 - Approved
Effective approval date: 12 Aug 13
Historic statuses 10 Jul 13 - Published
10 Jul 13 - Summary note being prepared
22 Jul 13 - Awaiting EB decision