Project: 10549 Rinconada PV CDM Project - Request for post-registration changes
Project 10549 Rinconada PV CDM Project
PRC ref PRC-10549-001
Process track Issuance
DOE KTR
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?
Applicable crediting period 05 Feb 20 - 04 Feb 27
Assessment opinion Assessment opinion (548 KB)
Revised PDD Revised PDD (2347 KB)   Revised PDD - track changes (2348 KB)
Supplementary documents
Signed form Signed form (64 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 09 Feb 22 - Approved
Effective approval date: 09 Feb 22
Historic statuses 11 Jan 22 - Request published