Project: 2665 Methane Recovery in Wastewater Treatment, Project AMA07-W-07, Kedah, Malaysia - Request for post-registration changes
Project 2665 Methane Recovery in Wastewater Treatment, Project AMA07-W-07, Kedah, Malaysia
PRC ref PRC-2665-001
Process track Prior approval
DOE TUV RHEIN
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 12 Nov 2010 - 17 Apr 2011
Assessment opinion Assessment opinion (234 KB)
Revised PDD  
Supplementary documents Appendix 1 - PUBLIC_2665_ERSS_ECF_170512.pdf (19 KB)
Appendix 2 - PUBLIC_WWCampaign_170512.pdf (35 KB)
Appendix 3 - Response to the incompleteness check of the request for approval ofchanges to the CDM project activity "Methane Recovery in Wastewater Treatment, Project AMA07-W-07, Kedah, Malaysia (Ref. no: 2665) (54 KB)
Signed form Signed form (59 KB)
DOE clarification
VVS version VVS 2.0
Current status 12 Oct 12 - Approved
Effective approval date: 12 Oct 12
Historic statuses 10 Sep 12 - Published
10 Sep 12 - Summary note being prepared
21 Sep 12 - Awaiting EB decision