Project: 2131 25MW Liangwan Hydropower Development Project - Request for post-registration changes
Project 2131 25MW Liangwan Hydropower Development Project
PRC ref PRC-2131-001
Process track Issuance
DOE BVI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Apr 09 - 31 Mar 16
Assessment opinion Assessment opinion (143 KB)
Revised PDD Revised PDD (387 KB)   Revised PDD - track changes (396 KB)
Supplementary documents
Signed form Signed form (119 KB)
DOE clarification
VVS version VVS 2.0
Current status 06 Dec 12 - Approved
Effective approval date: 06 Dec 12
Historic statuses 07 Nov 12 - Request published