04:10 10 Jan 25
Project:
3366 Waste Heat Recovery and Utilisation for Power Generation Project of Xing’an Conch Cement Company Limited
- Request for post-registration changes
Project | 3366 Waste Heat Recovery and Utilisation for Power Generation Project of Xing’an Conch Cement Company Limited |
---|---|
PRC ref | PRC-3366-001 |
Process track | Prior approval |
DOE | SGS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 01 Apr 11 - 31 Mar 21 |
Assessment opinion | Assessment opinion (260 KB) |
Revised PDD | Revised PDD (1581 KB) Revised PDD - track changes (1630 KB) |
Supplementary documents | |
Signed form | Signed form (1981 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 11 Dec 12 -
Approved
Effective approval date: 10 Dec 12
|
Historic statuses |
06 Nov 12 -
Published 06 Nov 12 - Summary note being prepared 20 Nov 12 - Awaiting EB decision |