01:28 28 Oct 25
Project:
3366 Waste Heat Recovery and Utilisation for Power Generation Project of Xing’an Conch Cement Company Limited
- Request for post-registration changes
| Project | 3366 Waste Heat Recovery and Utilisation for Power Generation Project of Xing’an Conch Cement Company Limited |
|---|---|
| PRC ref | PRC-3366-001 |
| Process track | Prior approval |
| DOE | SGS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 01 Apr 11 - 31 Mar 21 |
| Assessment opinion |
Assessment opinion (260 KB)
|
| Revised PDD |
Revised PDD (1581 KB)
Revised PDD - track changes (1630 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (1981 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 11 Dec 12 -
Approved
Effective approval date: 10 Dec 12
|
| Historic statuses |
06 Nov 12 -
Published 06 Nov 12 - Summary note being prepared 20 Nov 12 - Awaiting EB decision |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: