Project: 5023 Redevelopment of Tana Hydro Power Station Project - Request for post-registration changes
Project 5023 Redevelopment of Tana Hydro Power Station Project
PRC ref PRC-5023-001
Process track Prior approval
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Changes to the project or programme design
  • Changes have an impact on:
Applicable crediting period 11 Oct 11 - 10 Oct 21
Assessment opinion Assessment opinion (383 KB)
Revised PDD Revised PDD (1251 KB)   Revised PDD - track changes (1248 KB)
Supplementary documents Appendix 1 - 5023- CER Sheet Updated.xls (47 KB)
Appendix 2 - Tana FA 3-10-2011_Modified.xls (125 KB)
Appendix 3 - Tana FA 3-10-2011_Original.xls (126 KB)
Signed form Signed form (969 KB)
DOE clarification DOE clarification 1 - 2014-07-28 Tana PRC Assessment Report.pdf (896 KB)
DOE clarification 2 - KenGen Farab Contract for Tana Project.pdf (2585 KB)
DOE clarification 3 - PPA KenGen KPLC Tana.pdf (1192 KB)
DOE clarification 4 - Prequalification Ad Redevelopment of Tana.pdf (803 KB)
DOE clarification 5 - Tana Hydropower - Energy Regulatory Commission Letter.pdf (241 KB)
DOE clarification 6 - Tender Evaluation Report- Redevelopment of Tana Hydropower Project Extracts.pdf (2846 KB)
VVS version VVS 2.0
Current status 17 Sep 14 - Approved
Effective approval date: 29 Aug 14
Historic statuses 01 Jul 14 - Published
14 Jul 14 - Awaiting DOE clarifications
28 Jul 14 - DOE clarifications received
28 Jul 14 - Summary note being prepared
08 Aug 14 - Awaiting EB decision