20:48 13 Nov 25
Project:
2496 Biogas Technology Group Ras Al-Khaimah Landfill Gas to Energy Project
- Request for post-registration changes
| Project | 2496 Biogas Technology Group Ras Al-Khaimah Landfill Gas to Energy Project |
|---|---|
| PRC ref | PRC-2496-001 |
| Process track | Prior approval |
| DOE | TÜV NORD |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
|
| Assessment opinion |
Assessment opinion (393 KB)
|
| Revised PDD | |
| Supplementary documents |
Appendix 1 - 2496 Biogas Report.xls (157 KB)
Appendix 2 - 2496 Daily Check Sheet_08_09.xls (536 KB)
Appendix 3 - 2496 Daily Check Sheet_27_09_09.xls (522 KB)
Appendix 4 - 2496 Daily Check Sheet_31_07_09.xls (537 KB)
Appendix 5 - 2496 RAK Deviation WB 31.08.2012.xlsx (1479 KB)
Appendix 6 - 2496 RAK Fault Log 2009.xls (78 KB)
|
| Signed form |
Signed form (51 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 06 Mar 13 -
Approved
Effective approval date: 28 Feb 13
|
| Historic statuses |
16 Jan 13 -
Published 16 Jan 13 - Summary note being prepared 07 Feb 13 - Awaiting EB decision |

Assessment opinion
Appendix 1 - 2496 Biogas Report.xls
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: