Project: 2496 Biogas Technology Group Ras Al-Khaimah Landfill Gas to Energy Project - Request for post-registration changes
Project 2496 Biogas Technology Group Ras Al-Khaimah Landfill Gas to Energy Project
PRC ref PRC-2496-001
Process track Prior approval
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 11 Jul 2009 - 30 Sep 2009
Assessment opinion Assessment opinion (393 KB)
Revised PDD  
Supplementary documents Appendix 1 - 2496 Biogas Report.xls (157 KB)
Appendix 2 - 2496 Daily Check Sheet_08_09.xls (536 KB)
Appendix 3 - 2496 Daily Check Sheet_27_09_09.xls (522 KB)
Appendix 4 - 2496 Daily Check Sheet_31_07_09.xls (537 KB)
Appendix 5 - 2496 RAK Deviation WB 31.08.2012.xlsx (1479 KB)
Appendix 6 - 2496 RAK Fault Log 2009.xls (78 KB)
Signed form Signed form (51 KB)
DOE clarification
VVS version VVS 2.0
Current status 06 Mar 13 - Approved
Effective approval date: 28 Feb 13
Historic statuses 16 Jan 13 - Published
16 Jan 13 - Summary note being prepared
07 Feb 13 - Awaiting EB decision