10:53 27 Dec 24
Project:
10213 Small scale Obra JFM A/R CDM Project on degraded lands in Obra Forest Division, Uttar Pradesh, India
- Request for post-registration changes
Project | 10213 Small scale Obra JFM A/R CDM Project on degraded lands in Obra Forest Division, Uttar Pradesh, India |
---|---|
PRC ref | PRC-10213-001 |
Process track | Issuance |
DOE | TÜV NORD |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes specific to A/R project activities
|
Applicable crediting period | 01 Jan 12 - 31 Dec 31 |
Assessment opinion | Assessment opinion (679 KB) |
Revised PDD | Revised PDD (59 KB) Revised PDD - track changes (230 KB) |
Supplementary documents | |
Signed form | Signed form (125 KB) |
DOE clarification | |
VVS version | VVS-PA 2.0 |
Current status | 17 May 19 -
Approved
Effective approval date: 17 May 19
|
Historic statuses |
18 Apr 19 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: