Project: 4131 Xiyinghe Sangou Bundled Hydropower Project - Request for post-registration changes
Project 4131 Xiyinghe Sangou Bundled Hydropower Project
PRC ref PRC-4131-001
Process track Prior approval
DOE CQC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 May 2011 - 23 Sep 2011
Assessment opinion Assessment opinion (208 KB)
Revised PDD  
Supplementary documents Appendix 1 - 向 (113 KB)
Appendix 2 - Emission Reduction Calculation Sangou Bundled-deviation.xls (76 KB)
Signed form Signed form (187 KB)
DOE clarification
VVS version VVS 2.0
Current status 26 Sep 12 - Approved
Effective approval date: 25 Sep 12
Historic statuses 21 Aug 12 - Published
21 Aug 12 - Summary note being prepared
04 Sep 12 - Awaiting EB decision