Project: 2765 Installation of Solar Home Systems in Bangladesh - Request for post-registration changes
Project 2765 Installation of Solar Home Systems in Bangladesh
PRC ref PRC-2765-001
Process track Prior approval
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 26 Jun 12 - 25 Jun 19
Assessment opinion Assessment opinion (303 KB)
Revised PDD Revised PDD (1041 KB)   Revised PDD - track changes (686 KB)
Supplementary documents Appendix 1 - 2765-0001_CPA-DD_ver10.pdf (905 KB)
Appendix 2 - 2765-0002_CPA-DD_ver03.pdf (1015 KB)
Appendix 3 - 2765-0003_CPA-DD_ver03.pdf (1000 KB)
Appendix 4 - 2765-0004_CPA-DD_ver03.pdf (1016 KB)
Appendix 5 - 2765-0005_CPA-DD_ver03.pdf (1002 KB)
Appendix 6 - 2765-0006_CPA-DD_ver03.pdf (997 KB)
Appendix 7 - 2765-0007_CPA-DD_ver03.pdf (1007 KB)
Appendix 8 - 2765-0008_CPA-DD_ver03.pdf (994 KB)
Appendix 9 - 2765-0009_CPA-DD_ver03.pdf (916 KB)
Appendix 10 - 2765-0010_CPA-DD_ver03.pdf (917 KB)
Appendix 11 - 2765-0011_CPA-DD_ver03.pdf (922 KB)
Appendix 12 - 2765-0012_CPA-DD_rev03.pdf (947 KB)
Appendix 13 - 2765-0013_CPA-DD_rev03.pdf (943 KB)
Signed form Signed form (719 KB)
DOE clarification
VVS version VVS 5.0
Current status 04 Jun 14 - Approved
Effective approval date: 15 May 14
Historic statuses 10 Apr 14 - Published
10 Apr 14 - Summary note being prepared
24 Apr 14 - Awaiting EB decision