Project: 6972 Jingneng Beijing Badaling Solar Power Pilot Project - Request for post-registration changes
Project 6972 Jingneng Beijing Badaling Solar Power Pilot Project
PRC ref PRC-6972-001
Process track Prior approval
DOE CTI Certification
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Changes to the project or programme design
  • Changes have an impact on: Actual operational parameters differ from the expected parameters
Applicable crediting period 01 Aug 13 - 31 Jul 20
Assessment opinion Assessment opinion (235 KB)
Revised PDD Revised PDD (970 KB)   Revised PDD - track changes (987 KB)
Supplementary documents
Signed form Signed form (164 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 17 Sep 21 - Approved
Effective approval date: 16 Sep 21
Historic statuses 23 Aug 21 - Published
23 Aug 21 - Summary note being prepared
27 Aug 21 - Awaiting EB decision