Project: 6447 Zhejiang Tangcun 32MW Hydropower Project - Request for post-registration changes
Project 6447 Zhejiang Tangcun 32MW Hydropower Project
PRC ref PRC-6447-001
Process track Issuance
DOE RINA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 20 Jun 2012 - 31 Dec 2012
Assessment opinion Assessment opinion (653 KB)
Revised PDD  
Supplementary documents
Signed form Signed form (84 KB)
DOE clarification
VVS version VVS 2.0
Current status 01 Aug 13 - Approved
Effective approval date: 01 Aug 13
Historic statuses 03 Jul 13 - Request published