12:01 11 Nov 25
Project:
6283 Distribution of fuel-efficient improved cooking stoves in Nigeria
- Request for post-registration changes
| Project | 6283 Distribution of fuel-efficient improved cooking stoves in Nigeria |
|---|---|
| PRC ref | PRC-6283-002 |
| Process track | Prior approval |
| DOE | Carbon Check |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 07 Nov 12 - 06 Nov 19 |
| Assessment opinion |
Assessment opinion (1111 KB)
|
| Revised PDD |
Revised PDD (1942 KB)
Revised PDD - track changes (2006 KB)
|
| Supplementary documents |
Appendix 1 - 6283 CPA 1 version 6 Clean.pdf (1336 KB)
Appendix 2 - 6283 CPA 1 version 6 trackchanges.pdf (1421 KB)
Appendix 3 - 6283 CPA 2 version 2 clean.pdf (2035 KB)
Appendix 4 - 6283 CPA 2 version 2 trackchanges.pdf (2117 KB)
Appendix 5 - 6283 CPA 3 version 2 clean.pdf (1368 KB)
Appendix 6 - 6283 CPA 3 version 2 trackchanges.pdf (1450 KB)
Appendix 7 - 6283 CPA 4 version 2 clean.pdf (917 KB)
Appendix 8 - 6283 CPA 4 version 2 trackchanges.pdf (998 KB)
Appendix 9 - 6283 Sample size calculation SRS.XLSX (34 KB)
|
| Signed form |
Signed form (2071 KB)
|
| DOE clarification |
DOE clarification 1 - 6283 PoA DD version 11 Clean.pdf (1942 KB)
DOE clarification 2 - 6283 PoA DD version 11 trackchanges.pdf (2006 KB)
DOE clarification 3 - CCIPL 462-PRC(PoA 6283)-revised re-UN 23.01.2017 clean.pdf (1091 KB)
DOE clarification 4 - CCIPL 462-PRC(PoA 6283)-revised re-UN 23.01.2017 TC.pdf (1588 KB)
DOE clarification 5 - CCIPL 462-PRC(PoA 6283)-revised re-UN 15.02.2017 TC.pdf (1118 KB)
DOE clarification 6 - CCIPL 462-PRC(PoA 6283)-revised re-UN 15.02.2017 clean.pdf (1111 KB)
|
| VVS version | VVS 2.0 |
| Current status | 16 Mar 17 -
Approved
Effective approval date: 15 Mar 17
|
| Historic statuses |
10 Jan 17 -
Published 02 Feb 17 - Awaiting DOE clarifications 15 Feb 17 - DOE clarifications received 15 Feb 17 - Summary note being prepared 23 Feb 17 - Awaiting EB decision |

Assessment opinion
Appendix 9 - 6283 Sample size calculation SRS.XLSX
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: