Project: 2606 Piedade Small Hydro Power Plant CDM Project Activity - Request for post-registration changes
Project 2606 Piedade Small Hydro Power Plant CDM Project Activity
PRC ref PRC-2606-001
Process track Prior approval
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Changes to the project or programme design
  • Changes have an impact on:
Applicable crediting period 25 Aug 10 - 24 Aug 17
Assessment opinion Assessment opinion (94 KB)
Revised PDD Revised PDD (485 KB)   Revised PDD - track changes (579 KB)
Supplementary documents Appendix 1 - 3_Piedade_Análise Sensibilidade_21.7 MW_final.xls (159 KB)
Signed form Signed form (173 KB)
DOE clarification
VVS version VVS 2.0
Current status 02 Jan 13 - Approved
Effective approval date: 02 Jan 13
Historic statuses 29 Nov 12 - Published
29 Nov 12 - Summary note being prepared
12 Dec 12 - Awaiting EB decision