23:39 10 Nov 25
Project:
3815 Wind Power Generation Project activity by Interocean Shipping India Private Limited
- Request for post-registration changes
| Project | 3815 Wind Power Generation Project activity by Interocean Shipping India Private Limited |
|---|---|
| PRC ref | PRC-3815-001 |
| Process track | Prior approval |
| DOE | KBS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
| Applicable crediting period | 20 Nov 10 - 19 Nov 20 |
| Assessment opinion |
Assessment opinion (231 KB)
|
| Revised PDD |
Revised PDD (664 KB)
Revised PDD - track changes (611 KB)
|
| Supplementary documents |
Appendix 1 - Ex-ante ER Calculation_PRC sheet.xls (34 KB)
|
| Signed form |
Signed form (116 KB)
|
| DOE clarification |
DOE clarification 1 - TN WEG sale affidavit.pdf (265 KB)
|
| VVS version | VVS-PA 3.0 |
| Current status | 07 Oct 22 -
Approved
Effective approval date: 06 Oct 22
|
| Historic statuses |
22 Aug 22 -
Published 26 Aug 22 - Awaiting DOE clarifications 09 Sep 22 - DOE clarifications received 09 Sep 22 - Summary note being prepared 16 Sep 22 - Awaiting EB decision |

Assessment opinion
Appendix 1 - Ex-ante ER Calculation_PRC sheet.xls
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: