20:27 21 Nov 24
Project:
7873 27.3 MW Wind energy farm at Mokla Rajasthan by HZL
- Request for post-registration changes
Project | 7873 27.3 MW Wind energy farm at Mokla Rajasthan by HZL |
---|---|
PRC ref | PRC-7873-001 |
Process track | Issuance |
DOE | LGAI Tech. Center S.A |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 01 Dec 13 - 30 Nov 20 |
Assessment opinion | Assessment opinion (118 KB) |
Revised PDD | Revised PDD (502 KB) Revised PDD - track changes (555 KB) |
Supplementary documents | |
Signed form | Signed form (51 KB) |
DOE clarification | |
VVS version | VVS-PA 2.0 |
Current status | 30 Dec 20 -
Approved
Effective approval date: 30 Dec 20
|
Historic statuses |
01 Dec 20 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: