17:37 26 Jan 26
Project:
7873 27.3 MW Wind energy farm at Mokla Rajasthan by HZL
- Request for post-registration changes
| Project | 7873 27.3 MW Wind energy farm at Mokla Rajasthan by HZL |
|---|---|
| PRC ref | PRC-7873-001 |
| Process track | Issuance |
| DOE | LGAI Tech. Center S.A |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 01 Dec 13 - 30 Nov 20 |
| Assessment opinion |
Assessment opinion (118 KB)
|
| Revised PDD |
Revised PDD (502 KB)
Revised PDD - track changes (555 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (51 KB)
|
| DOE clarification | |
| VVS version | VVS-PA 2.0 |
| Current status | 30 Dec 20 -
Approved
Effective approval date: 30 Dec 20
|
| Historic statuses |
01 Dec 20 -
Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: