Project: 3431 49 MW Wind Power Project in Western India - Request for post-registration changes
Project 3431 49 MW Wind Power Project in Western India
PRC ref PRC-3431-001
Process track Issuance
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 02 Nov 10 - 01 Nov 20
Assessment opinion Assessment opinion (296 KB)
Revised PDD Revised PDD (1163 KB)   Revised PDD - track changes (642 KB)
Supplementary documents
Signed form Signed form (160 KB)
DOE clarification
VVS version VVS 2.0
Current status 03 Apr 13 - Approved
Effective approval date: 03 Apr 13
Historic statuses 05 Mar 13 - Request published