00:42 11 Jan 25
Project:
1651 Dujiawan Small Hydropower Project in Gansu Province
- Request for post-registration changes
Project | 1651 Dujiawan Small Hydropower Project in Gansu Province |
---|---|
PRC ref | PRC-1651-001 |
Process track | Issuance |
DOE | LGAI Tech. Center S.A |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 31 Aug 10 - 30 Aug 17 |
Assessment opinion | Assessment opinion (242 KB) |
Revised PDD | Revised PDD (747 KB) Revised PDD - track changes (761 KB) |
Supplementary documents | |
Signed form | Signed form (172 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 26 Apr 13 -
Approved
Effective approval date: 26 Apr 13
|
Historic statuses |
28 Mar 13 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: