11:29 27 Dec 24
Project:
10186 Accelerating Electrification through Grid Extension and Off-Grid Electrification in Rural Areas of Uganda
- Request for post-registration changes
Project | 10186 Accelerating Electrification through Grid Extension and Off-Grid Electrification in Rural Areas of Uganda |
---|---|
PRC ref | PRC-10186-002 |
Process track | Prior approval |
DOE | TÜV NORD |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Inclusion of a monitoring plan in the registered PDD, PoA-DD or CPA-DD |
Applicable crediting period | 28 Aug 15 - 27 Aug 22 |
Assessment opinion | Assessment opinion (857 KB) |
Revised PDD | Revised PDD (973 KB) Revised PDD - track changes (1061 KB) |
Supplementary documents | |
Signed form | Signed form (52 KB) |
DOE clarification | |
VVS version | VVS-PoA 1.0 |
Current status | 14 Jan 19 -
Approved
Effective approval date: 13 Jan 19
|
Historic statuses |
10 Dec 18 -
Published 10 Dec 18 - Summary note being prepared 24 Dec 18 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: