Project: 10186 Accelerating Electrification through Grid Extension and Off-Grid Electrification in Rural Areas of Uganda - Request for post-registration changes
Project 10186 Accelerating Electrification through Grid Extension and Off-Grid Electrification in Rural Areas of Uganda
PRC ref PRC-10186-002
Process track Prior approval
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Inclusion of a monitoring plan in the registered PDD, PoA-DD or CPA-DD
Applicable crediting period 28 Aug 15 - 27 Aug 22
Assessment opinion Assessment opinion (857 KB)
Revised PDD Revised PDD (973 KB)   Revised PDD - track changes (1061 KB)
Supplementary documents
Signed form Signed form (52 KB)
DOE clarification
VVS version VVS-PoA 1.0
Current status 14 Jan 19 - Approved
Effective approval date: 13 Jan 19
Historic statuses 10 Dec 18 - Published
10 Dec 18 - Summary note being prepared
24 Dec 18 - Awaiting EB decision