Project: 4728 The Capture and Utilisation of Methane at the Sibanye Gold Owned Beatrix Mine in South Africa - Request for post-registration changes
Project 4728 The Capture and Utilisation of Methane at the Sibanye Gold Owned Beatrix Mine in South Africa
PRC ref PRC-4728-002
Process track Issuance
DOE Carbon Check
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Apr 2012 - 26 Feb 2017

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?
Applicable crediting period 01 Jul 11 - 30 Jun 18
Assessment opinion Assessment opinion (824 KB)
Revised PDD Revised PDD (1797 KB)   Revised PDD - track changes (1783 KB)
Supplementary documents Appendix 1 - CCIPL387 PRC FVR (tc).doc.pdf (827 KB)
Signed form Signed form (2297 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 25 Jul 19 - Approved
Effective approval date: 25 Jul 19
Historic statuses 26 Jun 19 - Request published