Project: 10006 Efficiency Improvement by Boiler Rehabilitation in fossil fuel-fired (Natural Gas) Steam Boiler System - Request for post-registration changes
Project 10006 Efficiency Improvement by Boiler Rehabilitation in fossil fuel-fired (Natural Gas) Steam Boiler System
PRC ref PRC-10006-002
Process track Issuance
DOE Earthood
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Oct 14 - 30 Sep 24
Assessment opinion Assessment opinion (273 KB)
Revised PDD Revised PDD (1667 KB)   Revised PDD - track changes (1889 KB)
Supplementary documents Appendix 1 - 10006 PRC ER Calculation .xlsx (1664 KB)
Signed form Signed form (1280 KB)
DOE clarification
VVS version VVS 2.0
Current status 09 Mar 17 - Approved
Effective approval date: 09 Mar 17
Historic statuses 08 Feb 17 - Request published