Project:
6303 Biogas based power generation project at Jeongeup-si
- Request for post-registration changes
Project | 6303 Biogas based power generation project at Jeongeup-si |
---|---|
PRC ref | PRC-6303-001 |
Process track | Prior approval |
DOE | KEA |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
Change to the start date of the crediting period
|
Applicable crediting period | 15 Feb 14 - 14 Feb 24 |
Assessment opinion | Assessment opinion (249 KB) |
Revised PDD | Revised PDD (1476 KB) Revised PDD - track changes (1497 KB) |
Supplementary documents | |
Signed form | Signed form (567 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 17 Sep 14 -
Approved
Effective approval date: 16 Sep 14
|
Historic statuses |
12 Aug 14 -
Published 12 Aug 14 - Summary note being prepared 26 Aug 14 - Awaiting EB decision |