17:45 08 Jan 25
Project:
4389 Xinjiang Lasite Hydropower Project of China
- Request for post-registration changes
Project | 4389 Xinjiang Lasite Hydropower Project of China |
---|---|
PRC ref | PRC-4389-001 |
Process track | Issuance |
DOE | TUV RHEIN |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
|
Applicable crediting period | 27 May 11 - 26 May 18 |
Assessment opinion | Assessment opinion (1009 KB) |
Revised PDD | Revised PDD (698 KB) Revised PDD - track changes (698 KB) |
Supplementary documents |
Appendix 1 - Registered PDD_Lasite HP.pdf (697 KB)
|
Signed form | Signed form (908 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 09 Aug 13 -
Approved
Effective approval date: 09 Aug 13
|
Historic statuses |
11 Jul 13 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: