Project: 4389 Xinjiang Lasite Hydropower Project of China - Request for post-registration changes
Project 4389 Xinjiang Lasite Hydropower Project of China
PRC ref PRC-4389-001
Process track Issuance
DOE TUV RHEIN
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 27 May 11 - 26 May 18
Assessment opinion Assessment opinion (1009 KB)
Revised PDD Revised PDD (698 KB)   Revised PDD - track changes (698 KB)
Supplementary documents Appendix 1 - Registered PDD_Lasite HP.pdf (697 KB)
Signed form Signed form (908 KB)
DOE clarification
VVS version VVS 2.0
Current status 09 Aug 13 - Approved
Effective approval date: 09 Aug 13
Historic statuses 11 Jul 13 - Request published