06:00 06 Jan 25
Project:
5740 3 MW Hydro Power Project by Oreva Energy Pvt. Ltd
- Request for post-registration changes
Project | 5740 3 MW Hydro Power Project by Oreva Energy Pvt. Ltd |
---|---|
PRC ref | PRC-5740-001 |
Process track | Issuance |
DOE | Earthood |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 01 Feb 12 - 31 Jan 22 |
Assessment opinion | Assessment opinion (213 KB) |
Revised PDD | Revised PDD (868 KB) Revised PDD - track changes (917 KB) |
Supplementary documents |
Appendix 1 - UN5740 IRR_Oreva_3_MW_ PRC.xls (232 KB)
|
Signed form | Signed form (42 KB) |
DOE clarification | |
VVS version | VVS 9.0 |
Current status | 07 Oct 16 -
Approved
Effective approval date: 07 Oct 16
|
Historic statuses |
08 Sep 16 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: