Project: 7014 Improved Cook Stoves for East Africa (ICSEA) - Request for post-registration changes
Project 7014 Improved Cook Stoves for East Africa (ICSEA)
PRC ref PRC-7014-002
Process track Prior approval
DOE Carbon Check
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Change a methodology (including addition of methodology(ies))
Methodology(ies) list AMS-I.E. ver. 6 - Switch from non-renewable biomass for thermal applications by the user
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 17 Aug 12 - 16 Aug 19
Assessment opinion Assessment opinion (869 KB)
Revised PDD Revised PDD (5663 KB)   Revised PDD - track changes (6223 KB)
Supplementary documents
Signed form Signed form (2893 KB)
DOE clarification DOE clarification 1 - CCIPL 340 FVR ICSEA_PRC_VR_02022016_Clean.pdf (3934 KB)
DOE clarification 2 - CCIPL 340 FVR ICSEA_PRC_VR_02022016_TC.pdf (3938 KB)
DOE clarification 3 - ER Calculations per CPA Types I, II, III v03 Bill final.xlsx (3775 KB)
DOE clarification 4 - ICSEA PoA DD v12 2.2.2016 clean.pdf (5557 KB)
DOE clarification 5 - ICSEA PoA DD v12 2.2.2016 track changes_rev BB.pdf (5865 KB)
DOE clarification 6 - Response to clarification request ICSEA PRC.pdf (390 KB)
DOE clarification 7 - ICSEA PoA DD v14 track changes_26.02.2016.pdf (5557 KB)
DOE clarification 8 - ICSEA PoA DD v14 clean_26.02.2016.pdf (5382 KB)
DOE clarification 9 - ER Calculations per CPA Types I, II, III v05.xlsx (3782 KB)
DOE clarification 10 - ICSEA PRC_ Revised VR_26022016_Track Change.pdf (1070 KB)
DOE clarification 11 - ICSEA PRC_ Revised VR_26022016_Clean.pdf (1755 KB)
DOE clarification 12 - ICSEA PRC_Response to clarification request_26022016.pdf (361 KB)
VVS version VVS 2.0
Current status 05 Apr 16 - Rejected
Effective rejection date: 03 Apr 16. Reason (96 KB)
Historic statuses 06 Jan 16 - Published
22 Feb 16 - Awaiting DOE clarifications
29 Feb 16 - DOE clarifications received
29 Feb 16 - Summary note being prepared
04 Apr 16 - Awaiting EB decision