06:48 01 Jan 25
Project:
7014 Improved Cook Stoves for East Africa (ICSEA)
- Request for post-registration changes
Project | 7014 Improved Cook Stoves for East Africa (ICSEA) |
---|---|
PRC ref | PRC-7014-002 |
Process track | Prior approval |
DOE | Carbon Check |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
Change a methodology (including addition of methodology(ies)) |
Methodology(ies) list |
AMS-I.E. ver. 6 -
Switch from non-renewable biomass for thermal applications by the user
|
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Changes to the project or programme design
|
Applicable crediting period | 17 Aug 12 - 16 Aug 19 |
Assessment opinion | Assessment opinion (869 KB) |
Revised PDD | Revised PDD (5663 KB) Revised PDD - track changes (6223 KB) |
Supplementary documents | |
Signed form | Signed form (2893 KB) |
DOE clarification |
DOE clarification 1 - CCIPL 340 FVR ICSEA_PRC_VR_02022016_Clean.pdf (3934 KB)
DOE clarification 2 - CCIPL 340 FVR ICSEA_PRC_VR_02022016_TC.pdf (3938 KB) DOE clarification 3 - ER Calculations per CPA Types I, II, III v03 Bill final.xlsx (3775 KB) DOE clarification 4 - ICSEA PoA DD v12 2.2.2016 clean.pdf (5557 KB) DOE clarification 5 - ICSEA PoA DD v12 2.2.2016 track changes_rev BB.pdf (5865 KB) DOE clarification 6 - Response to clarification request ICSEA PRC.pdf (390 KB) DOE clarification 7 - ICSEA PoA DD v14 track changes_26.02.2016.pdf (5557 KB) DOE clarification 8 - ICSEA PoA DD v14 clean_26.02.2016.pdf (5382 KB) DOE clarification 9 - ER Calculations per CPA Types I, II, III v05.xlsx (3782 KB) DOE clarification 10 - ICSEA PRC_ Revised VR_26022016_Track Change.pdf (1070 KB) DOE clarification 11 - ICSEA PRC_ Revised VR_26022016_Clean.pdf (1755 KB) DOE clarification 12 - ICSEA PRC_Response to clarification request_26022016.pdf (361 KB) |
VVS version | VVS 2.0 |
Current status | 05 Apr 16 -
Rejected
Effective rejection date: 03 Apr 16.
Reason (96 KB)
|
Historic statuses |
06 Jan 16 -
Published 22 Feb 16 - Awaiting DOE clarifications 29 Feb 16 - DOE clarifications received 29 Feb 16 - Summary note being prepared 04 Apr 16 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: