Project: 3224 Cable Cars Metro Medellín, Colombia - Request for post-registration changes
Project 3224 Cable Cars Metro Medellín, Colombia
PRC ref PRC-3224-001
Process track Prior approval
DOE ICONTEC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 26 Apr 10 - 25 Apr 17
Assessment opinion Assessment opinion (255 KB)
Revised PDD Revised PDD (4314 KB)   Revised PDD - track changes (4309 KB)
Supplementary documents Appendix 1 - CER sheet 1.3.xls (153 KB)
Appendix 2 - MR 1.4 clean mode new 13.12.pdf (1315 KB)
Signed form Signed form (133 KB)
DOE clarification DOE clarification 1 - Clarifications.zip (10 MB)
VVS version VVS 2.0
Current status 27 Sep 13 - Approved
Effective approval date: 26 Sep 13
Historic statuses 16 Jul 13 - Published
01 Aug 13 - Awaiting DOE clarifications
21 Aug 13 - DOE clarifications received
21 Aug 13 - Summary note being prepared
05 Sep 13 - Awaiting EB decision