Project: 1526 Saldanha Small Hydroelectric Project - Request for post-registration changes
Project 1526 Saldanha Small Hydroelectric Project
PRC ref PRC-1526-001
Process track Issuance
DOE Earthood
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Changes to the project or programme design
  • Changes have an impact on: Actual operational parameters differ from the expected parameters
Applicable crediting period 16 Mar 09 - 15 Mar 19
Assessment opinion Assessment opinion (315 KB)
Revised PDD Revised PDD (1224 KB)   Revised PDD - track changes (1122 KB)
Supplementary documents Appendix 1 - Full Calculation (registered PDD revised PRC financial analysis) IRR + ex ante ER Sheet_adj.xls (248 KB)
Appendix 2 - 20210825 ecosecurities Saldanha ER Calculation v3.1.xlsx (1497 KB)
Signed form Signed form (126 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 02 Dec 21 - Approved
Effective approval date: 02 Dec 21
Historic statuses 03 Nov 21 - Request published