15:32 28 Nov 24
Project:
4532 Biomass based power project of Rayapati Power Generation Private Limited
- Request for post-registration changes
Project | 4532 Biomass based power project of Rayapati Power Generation Private Limited |
---|---|
PRC ref | PRC-4532-001 |
Process track | Prior approval |
DOE | SGS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 01 May 11 - 30 Apr 21 |
Assessment opinion | Assessment opinion (825 KB) |
Revised PDD | Revised PDD (1259 KB) Revised PDD - track changes (1504 KB) |
Supplementary documents |
Appendix 1 - Upload Information for Documents.pdf (14 KB)
Appendix 2 - ER Calculation_25052015.zip (42 KB) Appendix 3 - Financial Analysis_05122014.zip (46 KB) |
Signed form | Signed form (56 KB) |
DOE clarification |
DOE clarification 1 - Revised Assessment Opinion - 29.05.2015.pdf (825 KB)
|
VVS version | VVS 7.0 |
Current status | 09 Jun 15 - Awaiting DOE clarifications |
Historic statuses |
10 Mar 15 -
Published 29 May 15 - DOE clarifications received 29 May 15 - Summary note being prepared |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: