Project: 4532 Biomass based power project of Rayapati Power Generation Private Limited - Request for post-registration changes
Project 4532 Biomass based power project of Rayapati Power Generation Private Limited
PRC ref PRC-4532-001
Process track Prior approval
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 May 11 - 30 Apr 21
Assessment opinion Assessment opinion (825 KB)
Revised PDD Revised PDD (1259 KB)   Revised PDD - track changes (1504 KB)
Supplementary documents Appendix 1 - Upload Information for Documents.pdf (14 KB)
Appendix 2 - ER Calculation_25052015.zip (42 KB)
Appendix 3 - Financial Analysis_05122014.zip (46 KB)
Signed form Signed form (56 KB)
DOE clarification DOE clarification 1 - Revised Assessment Opinion - 29.05.2015.pdf (825 KB)



VVS version VVS 7.0
Current status 09 Jun 15 - Awaiting DOE clarifications
Historic statuses 10 Mar 15 - Published
29 May 15 - DOE clarifications received
29 May 15 - Summary note being prepared