Project:
3296 14MW MIRAE ASSET PV(photovoltaic) power plant bundling project
- Request for post-registration changes
| Project | 3296 14MW MIRAE ASSET PV(photovoltaic) power plant bundling project |
|---|---|
| PRC ref | PRC-3296-001 |
| Process track | Issuance |
| DOE | KSA |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
| Applicable crediting period | 16 Oct 10 - 15 Oct 17 |
| Assessment opinion |
Assessment opinion (255 KB)
|
| Revised PDD |
Revised PDD (4539 KB)
Revised PDD - track changes (4564 KB)
|
| Supplementary documents |
Appendix 1 - Economic analysis_MIRAE(120809).xlsx (375 KB)
|
| Signed form |
Signed form (130 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 30 Nov 12 -
Approved
Effective approval date: 30 Nov 12
|
| Historic statuses |
01 Nov 12 -
Request published |

Assessment opinion
Appendix 1 - Economic analysis_MIRAE(120809).xlsx