14:09 24 Oct 25
Project:
1620 Hedcor Sibulan 42.5 MW Hydroelectric Power Project
- Request for post-registration changes
| Project | 1620 Hedcor Sibulan 42.5 MW Hydroelectric Power Project |
|---|---|
| PRC ref | PRC-1620-001 |
| Process track | Issuance |
| DOE | TUV RHEIN |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 26 Feb 10 - 25 Feb 17 |
| Assessment opinion |
Assessment opinion (1876 KB)
|
| Revised PDD |
Revised PDD (1335 KB)
Revised PDD - track changes (1489 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (879 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 06 Feb 15 -
Approved
Effective approval date: 06 Feb 15
|
| Historic statuses |
08 Jan 15 -
Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform