07:43 25 Nov 24
Project:
9007 Distribution of Improved Cook Stoves in Sub-Saharan Africa
- Request for post-registration changes
Project | 9007 Distribution of Improved Cook Stoves in Sub-Saharan Africa |
---|---|
PRC ref | PRC-9007-001 |
Process track | Prior approval |
DOE | Carbon Check |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 25 Apr 13 - 24 Apr 20 |
Assessment opinion | Assessment opinion (1168 KB) |
Revised PDD | Revised PDD (18 MB) Revised PDD - track changes (18 MB) |
Supplementary documents |
Appendix 1 - Malawi_LOA_SSA_POA.pdf (426 KB)
|
Signed form | Signed form (2505 KB) |
DOE clarification |
DOE clarification 1 - 9007 PoA DD (Clean).pdf (20 MB)
DOE clarification 2 - 9007 PoA DD (TC).pdf (20 MB) DOE clarification 3 - CCIPL 590-PRC FVR_ver06_Clean.pdf (1187 KB) DOE clarification 4 - CCIPL 590-PRC FVR_ver06_TC.pdf (1190 KB) DOE clarification 5 - fNRB Calculation Malawi_CQ Capital_24 April 2018.xlsx (61 KB) |
VVS version | VVS-PoA 1.0 |
Current status | 04 Jul 18 -
Approved
Effective approval date: 02 Jul 18
|
Historic statuses |
08 May 18 -
Published 15 May 18 - Awaiting DOE clarifications 29 May 18 - DOE clarifications received 29 May 18 - Summary note being prepared 12 Jun 18 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: