16:14 23 Jan 25
Project:
4302 SASSA Low Pressure Solar Water Heater Programme
- Request for post-registration changes
Project | 4302 SASSA Low Pressure Solar Water Heater Programme |
---|---|
PRC ref | PRC-4302-002 |
Process track | Prior approval |
DOE | DNV |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 12 Mar 11 - 11 Mar 18 |
Assessment opinion | Assessment opinion (217 KB) |
Revised PDD | Revised PDD (577 KB) Revised PDD - track changes (442 KB) |
Supplementary documents |
Appendix 1 - PDD_form15_CPA005_2013 12 20_clean.pdf (743 KB)
Appendix 2 - PDD_form15_CPA005_2013 12 20.pdf (745 KB) Appendix 3 - PDD_form15_CPA006_2013 12 20_clean.pdf (745 KB) Appendix 4 - PDD_form15_CPA006_2013 12 20.pdf (751 KB) Appendix 5 - PDD_form15_CPA007_2013 12 20_clean.pdf (744 KB) Appendix 6 - PDD_form15_CPA007_2013 12 20.pdf (746 KB) |
Signed form | Signed form (247 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 09 Jul 14 -
Approved
Effective approval date: 01 Jul 14
|
Historic statuses |
22 May 14 -
Published 22 May 14 - Summary note being prepared 10 Jun 14 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: