Project: 2594 Bintulu Combined-Cycle Project STG Unit No.9, Tanjung Kidurong, Bintulu, Sarawak - Request for post-registration changes
Project 2594 Bintulu Combined-Cycle Project STG Unit No.9, Tanjung Kidurong, Bintulu, Sarawak
PRC ref PRC-2594-001
Process track Issuance
DOE LRQA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Jan 2012 - 30 Jun 2012

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 06 Apr 10 - 05 Apr 17
Assessment opinion Assessment opinion (87 KB)
Revised PDD Revised PDD (3321 KB)   Revised PDD - track changes (3317 KB)
Supplementary documents
Signed form Signed form (89 KB)
DOE clarification
VVS version VVS 2.0
Current status 03 Jun 13 - Approved
Effective approval date: 03 Jun 13
Historic statuses 03 May 13 - Request published