Project: 6787 Wang Phloeng Solar Power Plant Project - Request for post-registration changes
Project 6787 Wang Phloeng Solar Power Plant Project
PRC ref PRC-6787-001
Process track Issuance
DOE GLC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 02 May 13 - 01 May 20
Assessment opinion Assessment opinion (222 KB)
Revised PDD Revised PDD (1678 KB)   Revised PDD - track changes (1703 KB)
Supplementary documents Appendix 1 - Wang Phloeng solar ER calculation (PDD) 20140228.xlsx (17 KB)
Signed form Signed form (2165 KB)
DOE clarification
VVS version VVS 2.0
Current status 10 Jul 14 - Approved
Effective approval date: 10 Jul 14
Historic statuses 11 Jun 14 - Request published