Project: 3793 Pindó Biomass Energy Generation from Forest Biomass - Request for post-registration changes
Project 3793 Pindó Biomass Energy Generation from Forest Biomass
PRC ref PRC-3793-002
Process track Prior approval
DOE Earthood
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard?

Changes to the project or programme design
  • Changes have an impact on: Decrease in the capacity
Applicable crediting period 01 Jan 13 - 31 Dec 19
Assessment opinion Assessment opinion (1344 KB)
Revised PDD Revised PDD (2003 KB)   Revised PDD - track changes (2738 KB)
Supplementary documents Appendix 1 - 3793_ER PRC 03.03.2023 (sobre la base del documento del 02.10.2020 y con ajustes para levantar el rechazo).xls (1808 KB)
Appendix 2 - 3793_Additionality_Pindo_Rev PRC 02.03.2023 en base al documento del 21.10.2020 y ajustes para levantar el rechazo.xls (6361 KB)
Signed form Signed form (156 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 20 Sep 23 - Approved
Effective approval date: 03 Sep 23
Historic statuses 31 Jul 23 - Published
31 Jul 23 - Summary note being prepared
14 Aug 23 - Awaiting EB decision