00:21 20 Nov 24
Project:
0107 BII NEE STIPA
- Request for post-registration changes
Project | 0107 BII NEE STIPA |
---|---|
PRC ref | PRC-0107-002 |
Process track | Prior approval |
DOE | TÜV NORD |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 31 Dec 08 - 30 Dec 18 |
Assessment opinion | Assessment opinion (505 KB) |
Revised PDD | Revised PDD (639 KB) Revised PDD - track changes (752 KB) |
Supplementary documents | |
Signed form | Signed form (94 KB) |
DOE clarification |
DOE clarification 1 - Annex 4_clean.pdf (514 KB)
DOE clarification 2 - Annex 4_tc.pdf (573 KB) |
VVS version | VVS 9.0 |
Current status | 11 Apr 16 -
Approved
Effective approval date: 10 Apr 16
|
Historic statuses |
16 Feb 16 -
Published 22 Feb 16 - Awaiting DOE clarifications 07 Mar 16 - DOE clarifications received 07 Mar 16 - Summary note being prepared 21 Mar 16 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: