06:59 30 Nov 25
Project:
0107 BII NEE STIPA
- Request for post-registration changes
| Project | 0107 BII NEE STIPA |
|---|---|
| PRC ref | PRC-0107-002 |
| Process track | Prior approval |
| DOE | TÜV NORD |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 31 Dec 08 - 30 Dec 18 |
| Assessment opinion |
Assessment opinion (505 KB)
|
| Revised PDD |
Revised PDD (639 KB)
Revised PDD - track changes (752 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (94 KB)
|
| DOE clarification |
DOE clarification 1 - Annex 4_clean.pdf (514 KB)
DOE clarification 2 - Annex 4_tc.pdf (573 KB)
|
| VVS version | VVS 9.0 |
| Current status | 11 Apr 16 -
Approved
Effective approval date: 10 Apr 16
|
| Historic statuses |
16 Feb 16 -
Published 22 Feb 16 - Awaiting DOE clarifications 07 Mar 16 - DOE clarifications received 07 Mar 16 - Summary note being prepared 21 Mar 16 - Awaiting EB decision |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: