17:22 07 Nov 25
Project:
6606 KTDA Small Hydro Programme of Activities
- Request for post-registration changes
| Project | 6606 KTDA Small Hydro Programme of Activities |
|---|---|
| PRC ref | PRC-6606-001 |
| Process track | Prior approval |
| DOE | TÜV NORD |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
Change a methodology (including addition of methodology(ies)) |
| Methodology(ies) list |
AMS-I.F. ver. 3 -
Renewable electricity generation for captive use and mini-grid
|
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
| Applicable crediting period | 14 Sep 12 - 13 Sep 19 |
| Assessment opinion |
Assessment opinion (746 KB)
|
| Revised PDD |
Revised PDD (1672 KB)
Revised PDD - track changes (2036 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (297 KB)
|
| DOE clarification |
DOE clarification 1 - S01-F039.pdf (299 KB)
|
| VVS version | VVS-PoA 2.0 |
| Current status | 07 Nov 19 -
Approved
Effective approval date: 06 Nov 19
|
| Historic statuses |
05 Aug 19 -
Published 19 Aug 19 - Awaiting DOE clarifications 01 Oct 19 - DOE clarifications received 01 Oct 19 - Summary note being prepared 17 Oct 19 - Awaiting EB decision |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: