Project:
6606 KTDA Small Hydro Programme of Activities
- Request for post-registration changes
Project | 6606 KTDA Small Hydro Programme of Activities |
---|---|
PRC ref | PRC-6606-001 |
Process track | Prior approval |
DOE | TÜV NORD |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
Change a methodology (including addition of methodology(ies)) |
Methodology(ies) list |
AMS-I.F. ver. 3 -
Renewable electricity generation for captive use and mini-grid
|
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 14 Sep 12 - 13 Sep 19 |
Assessment opinion | Assessment opinion (746 KB) |
Revised PDD | Revised PDD (1672 KB) Revised PDD - track changes (2036 KB) |
Supplementary documents | |
Signed form | Signed form (297 KB) |
DOE clarification |
DOE clarification 1 - S01-F039.pdf (299 KB)
|
VVS version | VVS-PoA 2.0 |
Current status | 07 Nov 19 -
Approved
Effective approval date: 06 Nov 19
|
Historic statuses |
05 Aug 19 -
Published 19 Aug 19 - Awaiting DOE clarifications 01 Oct 19 - DOE clarifications received 01 Oct 19 - Summary note being prepared 17 Oct 19 - Awaiting EB decision |