Project: 8288 IOT Mabagas Limited power plant, Pudhuchatram - Request for post-registration changes
Project 8288 IOT Mabagas Limited power plant, Pudhuchatram
PRC ref PRC-8288-001
Process track Issuance
DOE Earthood
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 May 2016 - 20 Apr 2017

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Jan 13 - 31 Dec 22
Assessment opinion Assessment opinion (297 KB)
Revised PDD Revised PDD (1568 KB)   Revised PDD - track changes (1577 KB)
Supplementary documents Appendix 1 - 8288 ER Sheet_200313.xlsx (12 MB)
Appendix 2 - 8288 Verification report_clean.pdf (885 KB)
Signed form Signed form (125 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 22 May 20 - Approved
Effective approval date: 22 May 20
Historic statuses 23 Apr 20 - Request published