08:40 06 Nov 25
Project:
8643 Olkaria I Units 4&5 Geothermal Project
- Request for post-registration changes
| Project | 8643 Olkaria I Units 4&5 Geothermal Project |
|---|---|
| PRC ref | PRC-8643-001 |
| Process track | Issuance |
| DOE | AENOR |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
| Applicable crediting period | 01 Jan 15 - 31 Dec 21 |
| Assessment opinion |
Assessment opinion (333 KB)
|
| Revised PDD |
Revised PDD (849 KB)
Revised PDD - track changes (1034 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (154 KB)
|
| DOE clarification | |
| VVS version | VVS-PA 2.0 |
| Current status | 17 Aug 21 -
Approved
Effective approval date: 17 Aug 21
|
| Historic statuses |
19 Jul 21 -
Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: