Project: 1113 Project for the catalytic reduction of N2O emissions with a secondary catalyst inside the ammonia reactor of the nitric acid plant at Fertilizers & Chemicals Ltd., Haifa, Israel - Request for post-registration changes
Project 1113 Project for the catalytic reduction of N2O emissions with a secondary catalyst inside the ammonia reactor of the nitric acid plant at Fertilizers & Chemicals Ltd., Haifa, Israel
PRC ref PRC-1113-001
Process track Issuance
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 29 Nov 07 - 28 Nov 17
Assessment opinion Assessment opinion (187 KB)
Revised PDD Revised PDD (833 KB)   Revised PDD - track changes (1469 KB)
Supplementary documents
Signed form Signed form (170 KB)
DOE clarification
VVS version VVS 2.0
Current status 10 Mar 14 - Approved
Effective approval date: 10 Mar 14
Historic statuses 07 Feb 14 - Request published