00:32 31 Jan 25
Project:
2850 Sichuan Muli River Dashawan Hydropower Station
- Request for post-registration changes
Project | 2850 Sichuan Muli River Dashawan Hydropower Station |
---|---|
PRC ref | PRC-2850-001 |
Process track | Issuance |
DOE | TUV RHEIN |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 19 Apr 10 - 18 Apr 17 |
Assessment opinion | Assessment opinion (602 KB) |
Revised PDD | Revised PDD (1951 KB) Revised PDD - track changes (2022 KB) |
Supplementary documents | |
Signed form | Signed form (302 KB) |
DOE clarification | |
VVS version | VVS 9.0 |
Current status | 02 Feb 17 -
Approved
Effective approval date: 02 Feb 17
|
Historic statuses |
04 Jan 17 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: