14:07 14 Nov 25
Project:
2850 Sichuan Muli River Dashawan Hydropower Station
- Request for post-registration changes
| Project | 2850 Sichuan Muli River Dashawan Hydropower Station |
|---|---|
| PRC ref | PRC-2850-001 |
| Process track | Issuance |
| DOE | TUV RHEIN |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 19 Apr 10 - 18 Apr 17 |
| Assessment opinion |
Assessment opinion (602 KB)
|
| Revised PDD |
Revised PDD (1951 KB)
Revised PDD - track changes (2022 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (302 KB)
|
| DOE clarification | |
| VVS version | VVS 9.0 |
| Current status | 02 Feb 17 -
Approved
Effective approval date: 02 Feb 17
|
| Historic statuses |
04 Jan 17 -
Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: