Project: 2098 The 84 MW New Bong Escape Hydropower Project, Azad Jammu and Kashmir (AJK), Pakistan - Request for post-registration changes
Project 2098 The 84 MW New Bong Escape Hydropower Project, Azad Jammu and Kashmir (AJK), Pakistan
PRC ref PRC-2098-001
Process track Prior approval
DOE TUV RHEIN
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Change to the start date of the crediting period
  • Proposed start date of crediting period: 30 Sep 2012
Assessment opinion Assessment opinion (465 KB)
Revised PDD Revised PDD (796 KB)   Revised PDD - track changes (808 KB)
Supplementary documents Appendix 1 - NBE CER 20120904 MR v2.xlsx (13 KB)
Signed form Signed form (89 KB)
DOE clarification
VVS version VVS 2.0
Current status 17 Jan 13 - Approved
Effective approval date: 14 Jan 13
Historic statuses 11 Dec 12 - Published
11 Dec 12 - Summary note being prepared
25 Dec 12 - Awaiting EB decision