Project: 0694 R K Powergen 20MW grid connected renewable energy biomass power project - Request for post-registration changes
Project 0694 R K Powergen 20MW grid connected renewable energy biomass power project
PRC ref PRC-0694-001
Process track Prior approval
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? No

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 17 Jan 04 - 16 Jan 14
Assessment opinion Assessment opinion (795 KB)
Revised PDD Revised PDD (1802 KB)   Revised PDD - track changes (1969 KB)
Supplementary documents Appendix 1 - ER Calculation_18.12.2012.zip (15 KB)
Signed form Signed form (42 KB)
DOE clarification DOE clarification 1 - Revised Validation Opinion CDM VER0187.pdf (795 KB)
VVS version VVS 2.0
Current status 27 Sep 13 - Approved
Effective approval date: 27 Sep 13
Historic statuses 30 Jul 13 - Published
13 Aug 13 - Awaiting DOE clarifications
27 Aug 13 - DOE clarifications received
27 Aug 13 - Summary note being prepared
06 Sep 13 - Awaiting EB decision