22:59 26 Jan 25
Project:
0694 R K Powergen 20MW grid connected renewable energy biomass power project
- Request for post-registration changes
Project | 0694 R K Powergen 20MW grid connected renewable energy biomass power project |
---|---|
PRC ref | PRC-0694-001 |
Process track | Prior approval |
DOE | SGS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 17 Jan 04 - 16 Jan 14 |
Assessment opinion | Assessment opinion (795 KB) |
Revised PDD | Revised PDD (1802 KB) Revised PDD - track changes (1969 KB) |
Supplementary documents |
Appendix 1 - ER Calculation_18.12.2012.zip (15 KB)
|
Signed form | Signed form (42 KB) |
DOE clarification |
DOE clarification 1 - Revised Validation Opinion CDM VER0187.pdf (795 KB)
|
VVS version | VVS 2.0 |
Current status | 27 Sep 13 -
Approved
Effective approval date: 27 Sep 13
|
Historic statuses |
30 Jul 13 -
Published 13 Aug 13 - Awaiting DOE clarifications 27 Aug 13 - DOE clarifications received 27 Aug 13 - Summary note being prepared 06 Sep 13 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform